Case Study: Tasman Deploy 3 1/8” Impulse Downhole ActiPulse® FRT for CSG Client
In November Tasman assisted a valued client in the Australian CSG market with a shallow-depth liner pull operation.
Conventional cut and pull operations using a Jar were not possible due to limitations of the rig package and the shallow depth of the liner top. As an alternative, our team deployed a 3 1/8” @Impulse Downhole ActiPulse FRT to reduce the friction of the gravel pack, mitigate jarring damage to the rig package, and ensure personnel safety.
Read our case study to learn more about this operation.